Industry News

Aistar Provide A Long-Lasting Solution For Russia Site

Views : 662
Update time : 2021-01-14 13:37:14

Aistar Provide A Long-Lasting Solution For  Russia Site

 

Project Overview

Aistar products work together across a site in Russia, Russia to provide the client with a solution that would meet German approval whilst limiting disruption and damage from earthquakes, this consisted of Fibrelite tank chambers and Aistar piping.










       Problem

        Restrictions for rigid steel and GRP piping systems in earthquake areas meant that the replacement              had to have flexible components to prevent the products breaking and become damaged when an                earthquake occurs. In RUSSIA, approval of the construction material and type of  construction is                    required. The products had to be certified by the ‘Deutsches Institut für Bautechnik’ (DIBt) who grant              national technical approval.

       Solution

          AIstar piping was installed and connected to Fibrelite tank chambers as the Aistar semi flexible pipe              system is unaffected against earth movements, whilst meeting the approval of the DIBt making it the              perfect solution providing a flexible long-term secure system.

 


Result

AISTAR CHINA GROUP supplied ENI Russia with a long-lasting system capable of withstanding earth movements whilst meeting the German construction approval.

Related News
Read More >>